Spring Sale 2025
Spring Sale 2025

Sanwa MA-WBS327 Silent Wireless Mouse

Stylish portable computer peripheral

Our smartphones, tablets, and laptops have become so much part of our lives that we have long moved on from looking at their specs (which these days are pretty much all excellent anyway) to instead admiring their design and how they fit in with our style and decore. This is also true for their own peripherals and the Sanwa MA-WBS327 Silent Wireless Mouse is an excellent example of how one can be a work of design art!

With a beautifully slim profile that allows it to fit nicely even in a purse and with a maximum thickness of a little under 3 cm (1.2"), the Sanwa MA-WBS327 Silent Wireless Mouse has been designed to accommodate both right- and left-handed users. Part of its elegant design is the palette of colors it comes with: you can choose between pastel green, pink, purple, and beige, just like you would with a fashion accessory! It supports Windows 10 and 11 and macOS 11 to 14, it only takes a single AA battery to power, and the receiver is so tiny, it hardly protrudes from your device!

Specs and Features:

  • Colors: green, pink, purple, beige
  • Slim, highly portable
  • Symmetrical design for comfortable right-handed and left-handed use
  • Very small receiver
  • Receiver can be stored inside mouse
  • Wireless frequency: 2.4 GHz
  • Interface: USB HID Ver. 1.1 compatible
  • Connector: USB Type A
  • Reading method: optical sensor (blue LED)
  • Buttons: 3 (left, right, roller)
  • Communication range: 2-10 m (6.6-33 ft) depending on the surface material
  • Pointer speed: 1,000, 1,600 dpi
  • Power switch for reducing battery consumption when not in use
  • Dimensions (mouse): 58 x 110 x 29 mm (2.3 x 4.3 x 1.1")
  • Dimensions (receiver): approx. 14.3 x 19.5 x 6.5 mm (0.6 x 0.8 x 0.3")
  • Weight (mouse): approx. 55 g (1.9 oz)
  • Weight (receiver): approx. 2 g (0.1 oz)
  • Power: 1 AA battery
  • Supported OS: Windows 11, Windows 10, macOS (Sonoma) 14, macOS (Ventura) 13, macOS (Monterey) 12, macOS (BigSur) 11
  • Comes with receiver
  • Instructions/manual: Japanese
Other products in this category
US$ 36
(Option prices include additional shipping costs if applicable)